CE9 Construction in Full Swing; CE8 is Now Energized by Meralco:
Dumaan nga pala kami sa CE kanina. Kaya lang di na kami nakapaglibot kasi may mga pupuntahan pa kami. Sandali lang kami dun. About 30minutes lang. I basically talked to the possible contractor ng renovations ko.
Construction at CE9-Right Phase is now in full swing. CE9-Left Phase (the swimming pool side) and CE9-Middle Phase (in front of the clubhouse entrance) are still vacant. These 2 major CE9 blocks only have the the model units, and other future model units like the British-inspired houses (like in Lancaster Estates), in preparation to the "rumored" expansion of Carmona Estates. I think construction on these lots would start by next year.
May second floor na ang bahay ko. May ground flooring na din. Pinapatuyo na ang stairs. May bakal na na pagkakabitan ng bubong. Nakamolde na din ang poste ng balcony. Yung mga surface cracks sa ground floor PCPs ko, narepair na din nila using Mortabond Mortar Repair. May steel frame na din windows. Sa tingin ko, mukang mid-August ang tapos ng bahay ko. Then inspection ko na yun.
Yung ibang lote na bakante pa last June 12 na visit ko, may mga construction na din. Mostly nasa second floor na din. Ambilis gawin.
Sa CE8, madami na ding service posts. Magaganda ang design ng PFI posts. Hindi lang sya basta posteng tinayo. Parang every 2nd or 3rd house ang posteng pagkakabitan ng Meralco meter. Dami na ding CE8 units na na-energize na ng Meralco. May mga metro na sa kanila.
Balik ako dun next week. And will take some more pix.
Here are some CE9 pix na nakuha ko:
http://i1219.photobucket.com/albums/...2/DSC04163.jpg
http://i1219.photobucket.com/albums/...2/DSC04164.jpg
http://i1219.photobucket.com/albums/...2/DSC04162.jpg
http://i1219.photobucket.com/albums/...2/DSC04165.jpg
http://i1219.photobucket.com/albums/...2/DSC04167.jpg